FULL INSTALLATION SERVICE WITH ASSOCIATED H&S MEASURES

CONTRACTS MANAGERS WILL VISIT SITE PRIOR TO EACH INSTALLATION

SITE SPECIFIC RISK ASSESSMENTS AND SAFE WORKING METHOD STATEMENTS

SITE INSTALLATION TEAMS WITH THE APPROPRIATE CSCS AND CPCS CARDS

BEAM & BLOCK INSTALLED IN MOST WEATHER CONDITIONS

Installation icon

INSTALLATION

INSTALLATION

Treanor Pujol offer a full and comprehensive installation service with associated Health and Safety measures for all of our products throughout the UK.

Beam and Block Floor Installation

Beam and Block floors can be installed in most weather conditions, by a variety of methods, (e.g. by hand, using site plant, "Hiab" type lorry or mobile crane) depending upon site conditions. Once the beams have been set out according to the layout drawings, infill blocks are placed in the rows between the beams. The floor should be grouted with 4:1 sand / cement grout brushed into the joints between the beams and blocks to stabilise the floor.

Hollowcore Slab Installation

Installation of Hollowcore floor planks is straightforward. The units are hoisted into position on the supporting structure by crane and the joints grouted up to form a monolithic floor.

Coordination

Contracts Managers are trained as "Appointed Persons", and will visit Client's sites at an early stage to discuss intricate installation problems. As there is active liaison between Estimators, Designers and Contracts Managers, the most economical and structurally efficient solutions can be achieved.

RAMS

For each contract a Contracts Manager (CPCS Appointed Person BS7121), in conjunction with the Client's site staff, will prepare site specific Risk Assessments and Safe Working Method Statements. These documents, together with copies of Treanor Pujol's approved working drawings will be in the possession of the fixing team's foreman at the time of installation.

Installation teams

All members of our site installation teams have the appropriate CSCS and CPCS cards. Treanor Pujol are committed to ensuring that their site operatives are fully trained in all aspects of site installation.

Safety Equipment

We can provide and install the following safety equipment to supplement our installation service; all carried out by trained operatives with the appropriate CSCS cards:

The Main Contractor must ensure that the whole area to be protected and access to that area remains free from all site material and debris.

HOLLOW CORE SLAB LIFTING HOOKS LIFTING HOOKS ARE CAST INTO OUR HOLLOWCORE FLOORING UNITS (WHEN REQUIRED) TO MAKE THE INSTALLATION PROCESS QUICKER, EASIER AND ALSO SAFER. AS THEY ELIMINATE THE NEED FOR TRADITION LIFTING CHAINS THEY ALSO REDUCE THE RISK OF DAMAGE TO SOFFITS AND BLOCKWORK.

HOLLOW CORE SLAB LIFTING CHAINS

We can provide and install the following safety equipment to supplement our installation service; all carried out by trained operatives with the appropriate CSCS cards:

Small chain set for 100 plank to 250 deep units

Small chain set for 100 plank to 250 deep units

Large chain sling for 300 to 500 deep units

Large chain sling for 300 to 500 deep units